CO2 Plant
On rainy days a significant amount of water enters the building from the openings between the walls and the roof and therefore the electrical panel has been temporarily protected with plastic. After inspecting it the team concluded that the water coming into the building is not due to a faulty drainage system, but due to the opening that is large enough to allow the stormwater to enter when the wind is strong. This can be corrected by closing the gap and adequate sealing off.