Change Rooms

Some of the roof sheets of the Change Rooms have been replaced but the structural elements remained the same. The steel elements show signs of corrosion but are not severe. They must be treated against corrosion.

The drainage system is functional, but some walls show signs of infiltration. Impermeabilization is required.

Change Rooms: overview
Change Rooms