Malt intake
Anomalies observed during the site visit:
-
Corrosion on the roof.
-
Missing a portion of the roof.
Anomalies to address for the rehabilitation:
All anomalies listed above will be addressed as part of the rehabilitation.

Proceedings:
-
The roof supporting steel structure could not be inspected during the site visit due to inaccessibility, therefore it couldn’t be determined whether it requires only treatment or replacement. It must be safely accessed using cherry picker for a proper inspection to determine whether it can be treated for corrosion protection or must be replaced.
-
The missing roof sheet must be replaced with a new one.